The Admin at Yale Primary School was in need of a complete facelift.
Dva designed and manufactured a new front desk and storage area for the Administration team.
The desk was designed with 3 x workstations, all with under desk mobile pedestals and cable management holes in the desk for computer cables.
Desk Hobs were used for extra desk storage of files.
A lockable custom drawer and cupboard unit was designed for the back wall to store items and paperwork that needs to be locked away.
A corner shelf unit was also added on top of the cupboards as a funky way to showcase awards and artwork.